PDF 原檔:報告_OCP2026_Vertiv_SSCB與直流故障管理_20261015_original.pdf
講者公開簡報(OCP 官方 Recorded Content 頁提供下載)。文字以 PyMuPDF 逐頁抽取,
### p<n>為頁碼;圖表內容見原檔。
圖片清單(已驗證 2026-10-19)
| 檔名 | 頁 | 分類 | 親眼所見內容 |
|---|---|---|---|
報告_OCP2026_Vertiv_SSCB與直流故障管理_20261015_p4.png |
p4 | 真資料圖 | 保險絲、機械式直流斷路器、SSCB 五項比較表:清除時間(ms 級/ms 級/數十 µs)、限流、可重複切換、µs 故障資料、故障能量去向(電弧、弧室、箝位) |
報告_OCP2026_Vertiv_SSCB與直流故障管理_20261015_p5.png |
p5 | 真資料圖 | AC ITIC 曲線與 800VDC「DC ITIC」曲線並列:800V ±5% 正常、900V 穩態上限、1100V 箝位平台 20–300µs(本場提案)、2kV 突波(IEC 61000-4-5)、20ms 0V 容許(Diablo 400 holdup),多處標 TBD |
報告_OCP2026_Vertiv_SSCB與直流故障管理_20261015_p6.png |
p6 | 真資料圖 | 4000A、800V 直流匯流排示意:整流器、四個 1000A SSCB 分接箱、DC Fault Manager,標示 A 分接出口、B 遠端分接、C 匯流排本體三種故障點 |
報告_OCP2026_Vertiv_SSCB與直流故障管理_20261015_p7.png |
p7 | 文字卡 | SSCB 與 DC Fault Manager 兩種角色分工,及 A 分接出口、B 遠端分接、C 匯流排本體三種故障位置的選擇性判定表(C 只能由 Fault Manager 仲裁) |
報告_OCP2026_Vertiv_SSCB與直流故障管理_20261015_p8.png |
p8 | 真資料圖 | 故障時序流程(偵測跳脫 0.7–3µs、封鎖同儕小於 5µs、隔離定位 ms、再通電 秒)與 SSCB 對 DC Fault Manager 的建議介面訊號預算表(註明為提案、非實測) |
原始內容
p1
Ke Sun Solid-State Circuit Breaker (SSCB) and DC Fault Manager Protection at 800 VDC is a system function, not a device function RACK & POWER ]
p2
How the typical AC data center handles a fault today MV feed + transformer LV switchgear ACB short-time 300–400 ms UPS PDU MCCB short-time ~100 ms Rack PDU / branch instantaneous 1–2 cycles fault upstream is deliberately SLOWER curves must not overlap → only the nearest device trips 10⁰ 10¹ 10² 10⁻² 10⁰ 10² main ACB PDU MCCB branch current (× rating) clearing time (s) WAIT for the current zero Every 8.3 ms the arc extinguishes itself. The breaker only has to withstand the recovery voltage. DELAY upstream, on purpose Selectivity is bought with deliberate upstream delay — and ITIC lets IT load ride through a full 20 ms interruption. DISSIPATE in the arc The fault energy goes into the arc. The designer's problem is arc-flash safety in cal/cm², not “where do the joules go”.
p3
800 VDC revokes all three OCP Diablo 400 v0.7.0 §8.1.3 specifies fuses and relays on the ±400 V output — the DC protection layer is where the specification is still being written. WAIT FORCE the current to zero DELAY DETECT and act inside microseconds DISSIPATE ABSORB in a clamp, by design AC spends time. 800 VDC spends joules.
p4
SSCB Enables Advanced Fault Mgmt Strategy Diablo 400 §8.1.3 specifies fuses and relays today. Choosing solid state is what creates the clamp-sizing problem. Fuse Mechanical DC breaker Solid-state (SSCB) Clearing time ms-class, one-shot ms-class tens of µs Limits current before the prospective peak at extreme current no yes, by design Switches on command, repeatedly no — replace it yes, wear-limited yes µs fault data + upstream interlock none none yes Where the fault energy goes into the fuse arc into the arc chute into a clamp, by design
p5
DC power quality - "DC ITIC" curve AC — ITIC / CBEMA, defined since 1996 every PSU spec is written against it 10⁻⁶ 10⁻⁴ 10⁻² 10⁰ 10² 0 100 200 300 400 500 duration (s) voltage (% of nominal) PROHIBITED no interruption in function no damage 0 % allowed for 20 ms 800 VDC — DC ITIC Curve 10⁻⁶ 10⁻⁴ 10⁻² 10⁰ 10² 0 500 1000 1500 2000 duration (s) bus voltage (V) 800 V ± 5 % normal ? TBD ? TBD 2 kV surge · IEC 61000-4-5 0 V allowed for 20 ms Diablo 400 §7.1.3.1 holdup 1100 V clamp plateau, 20–300 µs ← THIS TALK determines this point 900 V steady max from existing standards proposed here undefined the slice, magnified who acts in which band normal rectifier / SST regulates caution telemetry and alarm warning storage / battery centre zone critical OVP coordination across devices plateau TVS clamping only Ref: OCP Data Center Facility - Low Voltage Direct Current Power Distribution V1.1.0, Power Quality
p6
Where these breakers actually sit DC busway · 4000 A · 800 V Rectifier 800 V SSCB 1000 A SSCB 1000 A SSCB 1000 A SSCB 1000 A Tap-off box × 4 (1000 A each) DC Fault Manager µs fault report · block / permissive open / close · re-energize handshake A B C A Tap-off outlet B Far tap-off outlet C The busway itself Loop inductance scales with how much busway the fault current has to travel — of order 0.1–0.2 µH per metre for a grouped-copper sandwich busway, and several times that for cable.
p7
Two roles in one fault SSCB — the device microseconds · local · no judgement · Detect di/dt and I_peak locally — no time to ask anyone · Force the current to zero and absorb the clamp energy · Provide galvanic isolation, on command (UL 489I) · Report a µs-resolution record of what it just saw DC Fault Manager — the system microseconds to seconds · sees the whole bus · Decide which zone actually faulted, from several reports · Block peers and upstream before they trip too · Own the re-energization sequence with the rectifier · Keep the health and wear state of every SSCB on the bus Selectivity moves from the curve to the link AC grades in time: 50–300 ms of deliberate upstream delay. 800 VDC at ~1 kA/µs: every SSCB on the bus sees the fault within a few µs — there is no delay left to grade with. Fault What the bus sees What makes it selective A tap-off outlet Only that branch carries forward fault current Local trip is already selective — the SSCB decides alone B far tap-off Same, but 10× the loop inductance → slower rise Longer detection budget; same local decision C busway itself Every tap-off feeds the fault in reverse, within a few µs Only the fault manager can arbitrate — a local trip drops the pod
p8
Trip and Re-energize Interrupting takes 40 µs. FAULT t = 0 DETECT + TRIP 0.7 – 3 µs SSCB BLOCK PEERS < 5 µs Fault Manager ISOLATE + LOCATE ms SSCB contacts + FM RE-ENERGIZE seconds FM + rectifier The fast half is the breaker. Everything to the right of it is the fault manager . A proposed minimum SSCB DC Fault Manager interface Signal Direction Budget Why it has to exist Trip event + µs timestamp SSCB → FM < 10 µs locate the faulted zone before anyone else trips Block / permissive FM → SSCB < 5 µs selectivity, now that time grading is gone di/dt and I_peak record SSCB → FM post-fault classify the fault and back out the real L_loop Open / close command FM → SSCB ms galvanic isolation and staged restart Health · thermal · clamp wear SSCB → FM periodic know the breaker's margin before the fault, not after Ready-to-energize handshake FM rectifier ms precharge and inrush control on re-energization The latency budgets are a proposal, not a measurement. Converging on them is the ask on the next slide.
p9
Call to action Three things the community can do that no single company can do alone. 1 Move to model-based design WHERE WE ARE An SSCB is specified today by rated current and breaking capacity. Whether it actually works is set by the loop it sits in — L_loop, di/dt, detection budget, clamp energy. None of that is on a datasheet. THE ASK Publish the model, not just the number: an open reference model with its parameters and an energy-balance self-check, so anyone can re-run it for their own layout. 2 Define a notional DC data centre WHERE WE ARE Every protection study uses its own topology and its own parasitics, so no two results can be compared. Power systems solved this decades ago with the IEEE 9-, 14- and 39-bus test systems. THE ASK Agree one notional 800 VDC pod: source impedance, busway L and R per metre, tap-off count and rating, load and link capacitance, storage contribution, and named fault locations. 3 Design the breaker and the system together WHERE WE ARE The breaker's design window is set by the system — bus voltage, withstand ceiling, L_loop. The system's ride- through is set by the breaker — clearing time, clamp energy, re-energize sequence. Neither side can specify alone. THE ASK SSCB suppliers and LVDC system designers working jointly inside OCP DC PD, on the SSCB DC Fault Manager interface and the fault-current envelope it has to serve. Contact: ke.sun@vertiv.com
p10
Thank You!