Stock LLM Wiki

報告_BofA_台積電2330_20261012

更新 2026-10-13

PDF 原檔:報告_BofA_台積電2330_20261012_original.pdf

圖片清單(已驗證 2026-10-13)

33 張抽圖皆 ≥25KB 且逐張 Read 確認,全數為真資料圖(BofA 內部圖表樣式,無封面/logo/文字卡)。

檔名 size 分類 親眼所見內容
_001.png 60KB 真資料圖 TSMC's wafer pricing (US$) 與 YoY:advanced vs mature/specialty 柱狀+折線圖,2015-2028E
_002.png 53KB 真資料圖 TSMC 5nm 及以下 wafer consumption/supply/utilization 柱狀+折線圖,1Q22-3Q28
_003.png 64KB 真資料圖 TSMC's wafer pricing + advanced node pricing premium vs mature/specialty,2015-2028E
_004.png 49KB 真資料圖 TSMC 3nm wafer consumption/supply/utilization,3Q23-3Q28
_005.png 39KB 真資料圖 Industry CoWoS-R/L wafer supply/demand 與 utilization,3Q24-3Q28
_006.png 59KB 真資料圖 CoWoS demand by customer(Nvidia/AMD/Broadcom/Google/Amazon/Meta等)2020-2028,含 YoY
_007.png 90KB 真資料圖 TSMC's wafer pricing (US$) 與 YoY,另一版本,2015-2028E
_008.png 42KB 真資料圖 TSMC's wafer pricing + advanced node premium vs mature,2015-2028E
_009.png 63KB 真資料圖 Foundry industry sales & capex、capital intensity,2007-2027
_010.png 61KB 真資料圖 Back-end industry sales & capex、capital intensity,2007-2027
_011.png 61KB 真資料圖 TSMC total capex vs equipment capex per k WPM,2010-2028
_012.png 104KB 真資料圖 TSMC revenue & capex、YoY & capital intensity,2010-2028
_013.png 77KB 真資料圖 TSMC capex breakdown by node(advanced/specialty/others),2010-2028,含 YoY
_014.png 29KB 真資料圖 TSMC capacity by node 年底值(20/16/12nm、7nm family、3nm family、N2 family、A16),2020-2028E
_015.png 46KB 真資料圖 TSMC capacity 組成:Mature/Specialty vs Advanced node,及 advanced % of total,2020-2028E
_016.png 65KB 真資料圖 TSMC 5nm 及以下 wafer consumption/supply/utilization,1Q22-3Q28(長期版)
_017.png 68KB 真資料圖 Major advanced demand at TSMC by product(Server CPU/AI accelerator/Mobile SoC等)k WPY,2022-2028,含 Server CPU YoY
_018.png 43KB 真資料圖 Major 5nm 及以下 wafer demand mix at TSMC(%組成),2022-2028
_019.png 53KB 真資料圖 TSMC 3nm wafer consumption/supply/utilization,3Q23-3Q28
_020.png 69KB 真資料圖 TSMC 3nm wafer consumption by customer(Apple/Mediatek/Qualcomm/Nvidia/AMD/Intel/Broadcom等),1Q23-4Q28
_021.png 79KB 真資料圖 CoWoS demand by customer(k WPY)與 YoY,2020-2028(另一分類版本)
_022.png 54KB 真資料圖 Industry CoWoS-R/L wafer demand/capacity/utilization,3Q24-3Q28
_023.png 58KB 真資料圖 TSMC SoIC supply/demand(k WPQ)與 utilization ex-CPO,1Q23-4Q28
_024.png 25KB 真資料圖 Transistor density(MTr/mm^2)比較:TSMC N3/N3E/N2P/A16/A12 vs Intel 3/18A/18A-P/14A
_025.png 57KB 真資料圖 大盤估值圖:weekly closing price 搭配 10x/13x/16x/21x/26x P/E 乘數線,Sep16-Sep26
_026.png 52KB 真資料圖 TSMC P/E band 歷史走勢(Avg P/E=16x,±1/2 std dev),Sep16-Sep26
_027.png 73KB 真資料圖 TSMC NTM forward P/E vs TSMC 客戶估值溢價(均溢價 22%)
_028.png 75KB 真資料圖 TSMC NTM forward P/E vs TSMC 主要 HPC 客戶估值溢價(均溢價 53%)
_029.png 76KB 真資料圖 Consensus NTM EPS expectations 與 NTM P/E based on consensus,Jan15-Feb26
_030.png 56KB 真資料圖 SOX P/E premium vs TSM ADR,SOX/TSM ADR forward P/E,Jan10-Jan26
_031.png 72KB 真資料圖 TSMC common 與 ADR conversion price、ADR premium(均溢價 8%),Jan02-Jan26
_032.png 56KB 真資料圖 TSMC 歷年目標價(PO, NT$)調整歷史圖,含分析師與日期標註,2024-2026
_033.png 64KB 真資料圖 同上 PO 歷史圖之 US$(ADR)版本,2024-2026

原始內容

Taiwan Semiconductor Manufacturing Co.

3Q26 earnings preview: steeper 2nm ramp lifting sales upside at resilient margins

Reiterate Rating: BUY | PO: 3,260 TWD | Price: 2,550 TWD

Solid HPC and flagship mobile pipeline solidifies 2H26

TSMC's 3Q26 sales were above street +18% QoQ in NT$ and reached US$46.7bn (vs. its guide of US$44.6-45.8bn) which we believe should be driven by the builds for Apple's mobile SoC and AMD's server CPU on 2nm along with multiple GPU and ASIC product refreshes migrating to 3nm. The mix upgrades could lift 4Q26 sales by +10-15% QoQ, putting it on track to the guidance for 40%+ YoY in '26. While utilization and pricing are favorable, GMs could hold steady in 3Q/4Q26 (BofAe 67.0%/67.8%) rather than expand (recent street 67-68%/68-69%) factoring dilution from 2nm and overseas fab ramps.

Tight supply enables greater value capture and investment

On solid AI demand outlook, TSMC's capex should be on track to its lifted guidance of US$60-64bn in '26 (BofAe US$63bn). The investment could see another surge in '27 (BofAe US$83bn) for further N3, N2, A16 and CoWoS-L expansion and new technologies ramp (e.g. CoPoS and CPO). The tool makers' modest price hike could require TSMC to spend 10% more capex though should be reflected in its value when the capacity starts production in '28 on top of a 5-10% leading edge ASP lift in 1Q27 on supply tightness.

Checkpoints: AI demand, capex & competition/partnership

1) TSMC's view on cloud AI investment amid rate hike + challenging FCF, 2) comment on the market and its growth and capex commitment, 3) update on the competition and collaboration (see Exhibit 29 for our analysis on Terafab/SpaceX) and US investment.

AI-led earnings outlook firmer; valuation should catch up

We lift our 26/27/28 EPS by 2-9% to NT$112/NT$161/NT$203 and keep our Buy rating on TSMC and raise PO to NT$3,260/US$620 on 20x '27E P/E. Its current valuation is undemanding at 16x '27E P/E (vs. its long term 11-21x) backed by its advanced technology leadership.

Estimates (Dec) (NT$) 2024A 2025A 2026E 2027E 2028E
Net Income (Adjusted - mn) 1,173,268 1,717,886 2,916,545 4,184,666 5,276,738
EPS 45.24 66.24 112.46 161.36 203.48
EPS Change (YoY) 39.9% 46.4% 69.8% 43.5% 26.1%
Consensus EPS (Visible Alpha) 107.72 146.40 183.73
Dividend / Share 18.00 21.50 24.00 24.00 24.00
Free Cash Flow / Share 33.55 38.66 69.93 96.56 138.58
ADR EPS (US$) 7.04 10.62 17.61 25.27 31.86
ADR Dividend / Share (US$) 2.80 3.45 3.76 3.76 3.76
Valuation (Dec)
P/E 56.36x 38.49x 22.67x 15.80x 12.53x
Dividend Yield 0.706% 0.843% 0.941% 0.941% 0.941%
EV / EBITDA* 31.70x 23.98x 15.14x 10.62x 8.61x
Free Cash Flow Yield* 1.32% 1.52% 2.74% 3.79% 5.43%
* For full definitions of iQmethod SM measures, see page 24.

This research report provides general information only. No part of this report may be used or reproduced or quoted in any manner whatsoever in Taiwan by the press or other persons without the express written consent of BofA Securities.

>> Employed by a non-US affiliate of BofAS and is not registered/qualified as a research analyst under the FINRA rules.

Refer to "Other Important Disclosures" for information on certain BofA Securities entities that take responsibility for the information herein in particular jurisdictions.

BofA Securities does and seeks to do business with issuers covered in its research reports. As a result, investors should be aware that the firm may have a conflict of interest that could affect the objectivity of this report. Investors should consider this report as only a single factor in making their investment decision.

Refer to important disclosures on page 25 to 28. Analyst Certification on page 22. Price

12 October 2026

Equity

Key Changes (NT$) Previous Current
Price Obj. 3,100.00 3,260.00
2026E EPS 110.20 112.46
2027E EPS 155.85 161.36
2028E EPS 187.89 203.48
2026E EBITDA (m) 4,083,248.5 4,155,258.3
2027E EBITDA (m) 5,745,945.1 5,927,984.9
2028E EBITDA (m) 6,793,119.0 7,307,336.4

Haas Liu >> Research Analyst Merrill Lynch (Taiwan) +886 2 2376 3727 haas.liu@bofa.com

Mike Yang >> Research Analyst Merrill Lynch (Taiwan) +886 2 2376 3729 mike.c.yang@bofa.com

Robert Cheng >> Research Analyst Merrill Lynch (Taiwan) +886 2 2376 3731

robert.cheng@bofa.com

Cathy Hsu >> Research Analyst Merrill Lynch (Taiwan) +886 2 2376 3726 cathy.hsu3@bofa.com

Stock Data
Price (Common / ADR) 2,550 TWD / 453.31 USD
Price Objective 3,260 TWD / 620.00 USD
Date Established 12-Oct-2026 / 12-Oct-2026
Investment Opinion B-1-7 / B-1-7
52-Week Range 1,375 TWD-2,590 TWD
Market Value (mn) 2,070,984 USD
Market Value (mn) 66,127,544 TWD
Shares Outstanding (mn) 25,932.4 / 5,186.5
Average Daily Value (mn) 1,767 USD
Free Float 92.2%
BofA Ticker / Exchange TSMWF / TAI
BofA Ticker / Exchange TSM / NYS
Bloomberg / Reuters 2330 TT / 2330.TW
ROE (2026E) 43.8%
Net Dbt to Eqty (Dec-2025A) -37.3%

iQprofile SM Taiwan Semiconductor Manufacturing Co.

Key Income Statement Data (Dec) 2024A 2025A 2026E 2027E 2028E
(NT$ Millions)
Sales 2,894,308 3,809,054 5,551,264 7,790,371 9,656,518
Gross Profit 1,624,354 2,281,294 3,733,064 5,371,382 6,653,851
Sell General & Admin Expense (96,888) (99,222) (110,416) (131,671) (145,125)
Operating Profit 1,322,053 1,936,092 3,323,549 4,866,929 6,097,850
Net Interest & Other Income 83,786 105,574 193,432 175,282 261,328
Associates NA NA NA NA NA
Pretax Income 1,405,839 2,041,666 3,516,980 5,042,211 6,359,178
Tax (expense) / Benefit (233,407) (326,266) (601,062) (860,526) (1,086,199)
Net Income (Adjusted) 1,173,268 1,717,886 2,916,545 4,184,666 5,276,738
Average Fully Diluted Shares Outstanding 25,932 25,933 25,933 25,933 25,933
Key Cash Flow Statement Data
Net Income 1,173,268 1,717,886 2,916,545 4,184,666 5,276,738
Depreciation & Amortization 662,797 688,096 831,710 1,061,056 1,209,487
Change in Working Capital (143,010) (72,100) (102,100) (161,737) (113,049)
Deferred Taxation Charge NA NA NA NA NA
Other Adjustments, Net 133,123 (58,907) 154,974 77,281 95,310
Cash Flow from Operations 1,826,177 2,274,976 3,801,128 5,161,266 6,468,486
Capital Expenditure (956,007) (1,272,411) (1,987,705) (2,657,265) (2,874,767)
(Acquisition) / Disposal of Investments (58,000) (37,014) (42,792) 7,594 475
Other Cash Inflow / (Outflow) 149,164 165,031 76,317 411 2,594
Cash Flow from Investing (864,843) (1,144,393) (1,954,180) (2,649,259) (2,871,699)
Shares Issue / (Repurchase) (9) (2) (2) 0 0
Cost of Dividends Paid (337,129) (440,855) (531,614) (622,377) (622,377)
Cash Flow from Financing (346,301) (440,345) (564,551) (624,253) (622,956)
Free Cash Flow 870,171 1,002,565 1,813,423 2,504,002 3,593,719
Net Debt (1,403,733) (2,035,607) (3,419,363) (5,306,194) (8,280,429)
Change in Net Debt (556,872) (647,079) (1,277,442) (1,889,630) (2,974,410)
Key Balance Sheet Data
Property, Plant & Equipment 3,234,980 3,691,841 5,015,572 6,578,562 8,037,977
Other Non-Current Assets 368,606 424,052 481,020 478,736 478,718
Trade Receivables 272,088 281,791 341,182 430,143 481,869
Cash & Equivalents 2,422,020 3,068,595 4,463,340 6,348,294 9,321,950
Other Current Assets 394,245 466,745 527,406 634,603 734,512
Total Assets 6,691,938 7,933,024 10,828,520 14,470,338 19,055,027
Long-Term Debt 958,429 896,062 895,282 892,832 892,526
Other Non-Current Liabilities 145,408 118,147 176,911 209,050 236,572
Short-Term Debt 59,858 136,926 148,695 149,268 148,995
Other Current Liabilities 1,204,667 1,321,094 1,682,008 1,732,227 1,786,768
Total Liabilities 2,368,362 2,472,229 2,902,896 2,983,378 3,064,861
Total Equity 4,323,576 5,460,795 7,925,624 11,486,960 15,990,166
Total Equity & Liabilities 6,691,938 7,933,024 10,828,520 14,470,338 19,055,027
iQmethod SM - Bus Performance*
Return On Capital Employed 23.2% 28.4% 36.3% 38.3% 35.2%
Return On Equity 30.3% 35.4% 43.8% 43.3% 38.5%
Operating Margin 45.7% 50.8% 59.9% 62.5% 63.1%
EBITDA Margin 68.6% 68.9% 74.9% 76.1% 75.7%
iQmethod SM - Quality of Earnings*
Cash Realization Ratio 1.6x 1.3x 1.3x 1.2x 1.2x
Asset Replacement Ratio 1.4x 1.8x 2.4x 2.5x 2.4x
Tax Rate (Reported) 16.6% 16.0% 17.1% 17.1% 17.1%
Net Debt-to-Equity Ratio -32.5% -37.3% -43.1% -46.2% -51.8%
Interest Cover NM NM NM NM NM

Key Metrics

  • For full definitions of iQmethod SM measures, see page 24.

Company Sector

Semiconductors

Company Description

TSMC was founded in 1987 and is listed in Taiwan (2330TT) and the US (TSM/NYS).TSMC is the largest and global leader in integrated circuit (IC) manufacturing. As a build-to-order foundry, it provides a wide range of valueadd activities: IC manufacturing, mask-making, IC design services, turnkey solutions, and process development. We attribute its success to its proven, winning business model, unparalleled scale advantage, optimized execution, and technology scope and depth. 5 shares = 1 ADR.

Investment Rationale

The ongoing semi content growth in mobile, rise of artificial intelligence (AI), and proliferation of Internet of Things (IoT) should result in sustainable upside in aggregate computing power globally. TSMC, as the leading contract manufacturer of semiconductor chips, is in a good position to capitalize. We are structurally positive on TSMC and expect it to sustain over 15% growth with rising FCF from 2026 onwards.

Stock Data
Shares / ADR 5.00
Price to Book Value 8.4x
Key Changes Current
(US$) Price Obj. Previous 590.00 620.00
2026E EPS 17.26 17.61
2027E EPS 24.40 25.27
2028E EPS 29.42 31.86

lül

Focus charts and tables

Exhibit 1: TSMC's wafer pricing by advanced vs. mature nodes

TSMC's wafer pricing by advanced vs. mature nodes

Source: BofA Global Research estimates

BofA GLOBAL RESEARCH

Exhibit 3: TSMC 5nm and below wafer consumption/supply/utilization

Utilization of 5nm and blow to remain high

Exhibit 2: TSMC's wafer pricing gap for advanced vs. mature nodes

TSMC's advanced node pricing is now 9x higher than mature ones

BofA GLOBAL RESEARCH

Exhibit 4: TSMC 3nm wafer consumption/supply/utilization

TSMC 3nm to see utilization staying close to full

Source: Company Data, BofA Global Research estimates

Exhibit 5: Industry CoWoS-R/L supply/demand

CoWoS-R/L utilization should stay at high levels

Industry CoWoS-R/L wafer supply/demand (k WPQ) CoWoS-R/L utilization

Source: BofA Global Research estimates

il

Source: Company Data, BofA Global Research estimates

Exhibit 6: Industry CoWoS demand

CoWoS demand should remain strong through 2028

BofA GLOBAL RESEARCH

BofA GLOBAL RESEARCH

BofA GLOBAL RESEARCH

BofA GLOBAL RESEARCH

3Q26 sales topped guidance; GMs tracking well but recent street could be too bullish

We profile our expectation for TSMC's 3Q26 earnings on October 15 th . 3Q26 sales were reported +18% QoQ in NT$, above BofAe/street expectations of +14%/+13% QoQ. Based on the average FX of NT$31.99/US$ (vs. its NT$32US$ guide), its sales in US$ term would be US$46.7bn, also above its guidance range of US$44.6-45.8bn. we believe the strength is led by strong ramp on 2nm potentially growing to 11% of its sales in 3Q26 (vs. 3% in 2Q26) for Apple's builds for its product launches and surging demand for AMD's Venice server CPU. These growth drivers on the node are supplemented by the incremental inventory stocking from Mediatek and Qualcomm for their flagship smartphone SoCs albeit at a low base and below seasonal due to weak Android demand.

On top of the 2nm scale up, we expect the utilization for 5nm and 3nm to stay above 100% backed by the continued HPC/AI build strength especially with multiple product upgrades including 1) accelerators (GPUs and ASICs): strong demand for Nvidia's Rubin GPU, AMD's MI400, AWS's Trainium3 ramp and initial ramp for Google's TPUv8t/i more than offsetting a mild wind down in Google's Ironwood TPU, 2) CPUs: solid demand for general purpose servers and AI data centers as noted in our deep dive report quantifying CPU demand through '30 across x86 (AMD's Turin CPUs) and ARM based CPUs (e.g. Nvidia's Vera CPU, Google's Axion CPU, AWS Graviton CPU along with incremental contribution from Microsoft Cobalt CPU) and 3) networking switch: more and faster data transmission in the complex AI data centers requires more advanced networking switch solutions from Nvidia/Mellanox, Broadcom and Marvell.

The company's better than expected sales in 3Q26 backed by healthy shipment and pricing trend on the advanced nodes should be supportive to its GMs. However, in contrast to the recent aggressive street expectations of 67-68% GMs in 3Q26, we only model it at the high-end of its guidance of 65-67%, balancing more favorable utilization and gradual 3nm depreciation roll off partially offset by a 3-4% GMs dilution from 2nm ramp which we believe is driver for the incremental sales during the quarter.

Exhibit 7: TSMC 3Q26-4Q26 and 2026-27 estimates BofAe vs. street

We lift our EPS estimates for '26/27 to NT$112.47/NT$161.37

3Q26E - BofAe 3Q26E - BofA Old 3Q26E - Street 4Q26E - BofAe 4Q26E - Old 4Q26E - Street 2026E - BofAe 2026E - Old 2026E - Street 2027E - BofAe 2027E - Old 2027E - Street
Sales (NT$mn) $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473 $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473 $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473 $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473 $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473 $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473 $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473 $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473 $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473 $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473 $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473 $1,494,243 $1,447,447 $1,452,942 $1,652,537 $1,625,222 $1,593,320 $5,551,264 $5,477,153 $5,434,682 $7,790,371 $7,711,575 $7,323,473
Sales QoQ / YoY (%) 17.6% 13.9% 14.4% 10.6% 12.3% 9.7% 45.7% 43.8% 42.7% 40.3% 40.8% 34.8%
Gross profit (NT$mn) $1,000,465 67.0% $961,703 66.4% $963,882 66.3% $1,120,993 67.8% $1,081,275 66.5% $1,050,189 65.9% $3,733,064 67.2% $3,654,584 66.7% $3,595,640 66.2% $5,371,382 68.9% $5,191,137 67.3% $4,844,770 66.2%
GMs (%) $891,981 $854,803 59.1% $842,101 58.0% $1,005,999 $971,167 $4,866,929 $4,232,893 57.8%
Operating profit (NT$mn) OpMs (%) 59.7% 60.9% 59.8% $922,996 57.9% $3,323,549 59.9% $3,251,539 59.4% $3,154,235 58.0% 62.5% $4,689,032 60.8%
Pretax profit Pretax margins (%) 61.8% 61.3% 60.2% 63.1% 62.1% 59.8% $3,516,980 63.4% 62.9% 61.8% 64.7% $4,870,519 63.2% 60.5%
(NT$mn) $924,044 $887,585 $873,964 $1,042,707 $1,008,753 $952,145 $3,446,566 $3,357,001 $5,042,211 $4,433,422
-$786,143
Tax expense (NT$mn) -$154,691 -$148,588 -$148,114 -$174,556 -$168,872 -$159,351 -$600,435 -$588,648 -$597,694 -$857,545 -$828,896
Tax rate (%) 16.7% 16.7% 16.9% 16.7% 16.7% 16.7% 17.1% 17.1% 17.8% 17.0% 17.0% 17.7%
Net profit (NT$mn) $769,353 $738,997 $725,850 $868,150 $839,881 $792,794 $2,916,545 $2,857,919 $2,759,307 $4,184,666 $4,041,623 $3,647,279
Net margins (%) 51.5% 51.1% 50.0% 52.5% 51.7% 49.8% 52.5% 52.2% 50.8% 53.7% 52.4% 49.8%
EPS (NT$) $29.67 $28.50 $28.08 $33.48 $32.39 $30.67 $112.47 $110.21 $107.37 $161.37 $155.85 $140.92

Source: BofA Global Research estimates, Bloomberg

BofA GLOBAL RESEARCH

lül

HPC/Apple lifting 4Q26 sales outlook; resilient GM expectation but below street

For 4Q26, based on its slightly above +40% YoY full year sales guide, TSMC's sales could grow 10-15% QoQ (BofAe +11%), better than its 10-year seasonality of 7% QoQ even off a high base from 1Q-3Q26. The blended ASPs strength (BofAe +11% QoQ) should be the key driver for 4Q26 sales as shipment mix continues to shift toward advanced nodes, with revenue from 5nm and below processes representing 75% of the company's sales (vs. 66%/71% in 2Q/3Q26). Specifically, 2nm with 15%+ higher wafer pricing than 3nm could further grow its contribution to 18% of TSMC's sales during the quarter. On the other hand, we model a stable wafer shipment (BofAe +9%/-5% QoQ for advanced/mature nodes), balancing HPC demand strength and Apple's seasonal chipset builds for its new product launches and a modest drop on the specialty process output and effective capacity loss due to equipment movement for the node conversion.

While the blended pricing is even more favorable and utilization on the advanced and mature nodes in general stay healthy, we model a relatively stable GMs only up to ~67.8% levels in 4Q26 (vs. recent street and investors' expectations at 68-69%). The key factors we consider as mildly negative offset would be 1) higher depreciation: +25-30% HoH in 2H26 due to more overseas and 2nm capacity ramp and 2) 2nm still going through yield learning curve and could see more meaningful impact in 4Q26 (vs. its 3-4% GMs dilution guide in 2H26) as the sales contribution grows.

Exhibit 8: Our 2026-28E earnings are 5-15% above consensus as we model a higher sales growth

TSMC 2026-28 estimates BofAe vs. Street

2026E - BofAe 2026E - Street 2026E - vs. street 2027E - BofAe 2027E - Street 2027E - vs. street 2028E - BofAe 2028E - Street 2028E - vs. street
Sales (NT$mn) Sales QoQ / YoY (%) $5,551,264 45.7% $5,434,682 42.7% 2% $7,790,371 40.3% $7,323,473 34.8% 6% $9,656,518 24.0% $9,152,144 25.0% 6%
Gross profit (NT$mn) GMs (%) $3,733,064 67.2% $3,595,640 66.2% 4% 1% $5,371,382 68.9% $4,844,770 66.2% 11% 3% $6,653,851 68.9% $6,033,826 65.9% 10% 3%
Operating profit (NT$mn) OpMs (%) $3,323,549 59.9% $3,154,235 58.0% 5% 2% $4,866,929 62.5% $4,232,893 57.8% 15% 5% $6,097,850 63.1% $5,255,681 57.4% 16% 6%
Pretax profit (NT$mn) Pretax margins (%) $3,516,980 63.4% $3,357,001 61.8% 5% 2% $5,042,211 64.7% $4,433,422 60.5% 14% 4% $6,359,178 65.9% $5,553,349 60.7% 15% 5%
Tax expense (NT$mn) Tax rate (%) -$600,435 17.1% -$597,694 17.8% 0% -1% -$857,545 17.0% -$786,143 17.7% 9% -1% -$1,082,440 17.0% -$998,175 18.0% 8% -1%
Net profit (NT$mn) Net margins (%) $2,916,545 52.5% $2,759,307 50.8% 6% 2% $4,184,666 53.7% $3,647,279 49.8% 15% 4% $5,276,738 54.6% $4,555,174 49.8% 16% 5%
EPS (NT$) $112.47 $107.37 5% $161.37 $140.92 15% $203.48 $176.56 15%

Source: BofA Global Research estimates, Bloomberg BofA GLOBAL RESEARCH

2026-27 sales and margins outlook solidified by healthy AI demand

Factoring in stronger CPU and AI GPU/ASIC demand outlook as noted in our Semicon Taiwan takeaways report where we updated our industry models, we are lifting our US$ sales expectation for TSMC in '26/'27 to +42%/+40% YoY respectively (vs. BofA prior +41%/+40% YoY). More importantly, with utilization staying tighter for longer along with inflationary cost pass through (e.g. equipment and consumables), TSMC should raise its advanced node and packaging pricing by 5-10% in the beginning of 2027 to reflect its value. This along with a mild 3-5% price hike on the mature nodes where the utilization is back to 90-95% as it optimizes the product mix following the strategic 6'/8' capacity retirement should lift its GMs to 67%/69% in 2026/27 (vs. BofA prior 67%/67%).

Exhibit 9: TSMC's wafer pricing by advanced vs. mature nodes TSMC's wafer pricing by advanced vs. mature nodes

Exhibit 10: TSMC's wafer pricing gap for advanced vs. mature nodes TSMC's advanced node pricing is now 9x higher than mature ones

Source: BofA Global Research estimates

Source: BofA Global Research estimates

BofA GLOBAL RESEARCH

Capex on track for lifted guide for 2026 and will grow 20%+ CAGR from '26-28

We lifted our front-end foundry industry capex growth expectation to 19%/26% YoY for '26/27 to US$86bn/US$108bn, supporting a CAGR of 16% from '26-28. This is mostly led by our higher expectation on TSMC's capex on stronger wafer demand on N3 and N2 from GPUs, ASICs, CPUs, networking switches and HBM base dies and initial ramp of A16, along with incremental spending reacceleration from tier 2 foundries.

Separately, we also raised the back-end packaging and testing industry spending estimates from 66%/36% YoY to 82%/21% YoY for '26/27 to US$27bn/US$33bn, supporting a CAGR of 15% from '26-28. The upward revision is driven by our higher expectation of TSMC's more aggressive capacity addition on CoWoS-R/L to accommodate more demand from its customers amid growing level of chipset complexity and reticle size and higher level of capacity readiness of SoIC for higher 3D packaging adoption for logic and memory dies integration and CPO. The more aggressive spending from ASE is set to grow by another 30-50% YoY in 2027 off a high base in 2026 on its own FoCoS capacity ramp and TSMC's CoWoS licensing.

BofA GLOBAL RESEARCH

il

Exhibit 11: Front-end sales, capex, and capital intensity

Front-end capex should reach US$86bn/US$108bn in '26/27

Exhibit 12: Back-end sales, capex, and capital intensity

Back-end capex should reach US$27bn/US$33bn in '26/27

Source: Company Data, BofA Global Research estimates, Bloomberg

BofA GLOBAL RESEARCH

Specifically on TSMC, based on our bottom up capacity analysis across front-end manufacturing and back-end packaging, TSMC's capex spending is tracking to US$63bn for 2026 (vs. its latest guidance of US$60-64bn) mostly skewed toward advanced frontend manufacturing including 55-60k WPM 3nm capacity addition, 60k WPM 2nm capacity ramp, initial 3-5k WPM A16 capacity installation. The back-end packaging investment should be largely driven by its CoWoS capacity growth while the spending on the equipment pull-in for CPO and CoPoS remains limited as most of the equipment are still under sampling process for qualification and meaningful shipment will be in 202728.

In addition to the earlier tool pull-in schedule due to tighter equipment supply with memory makers expanding, the fast-growing capex should reflect the rising cost per 1k WPM on the advanced nodes vs. mature nodes, with the equipment cost per 1k WPM advanced wafer capacity expansion has grown from US$156mn in 2023 to US$241mn in 2025. Even factoring in more common use of equipment on the advanced nodes, the capex/1k WPM advanced capacity could further rise by 20% to US$289mn in 2027 with the technology architecture upgrade.

On top of the investment in the core front-end manufacturing, we expect the company to slightly outspend in the back-end packaging and estimate it is at the upper half of its guidance for 10-20% total capex, mainly for more aggressive capacity expansion to meet its customers' demand amid growing competition from Intel's EMIB-T solution and technology innovation. On the other hand, the maintenance capex could be reduced for specialty technologies as the company gradually retires the equipment.

il

Source: Company Data, BofA Global Research estimates, Bloomberg

BofA GLOBAL RESEARCH

Exhibit 13: TSMC's total Capex vs. equipment spending per k WPM capacity addition

TSMC spend 1-2x more on 1k WPM expansion due to its shift to advanced nodes in recent years

TSMC's capex (US$mn) TSMC's equipment capex per k WPM (US$mn)

Source: Company Data, BofA Global Research estimates

BofA GLOBAL RESEARCH

Considering the capex required for further 3nm capacity expansion in the additional phases in its Tainan megafab, Arizona and the recently announced 2 nd fab in Kumamoto on strong AI/HPC/automotive demand, ramping scale for 2nm family including A16, R&D on A14 supplemented by multiple back-end packaging technologies in progress (e.g. CoWoS, CoPoS, SoIC, WMCM) and lower capex efficiency in its US operation, our bottom up model shows TSMC's capex could be US$83bn/US$90bn in 2027/28 at a CAGR of 20% CAGR from 2026-28.

Exhibit 14: TSMC's revenue and Capex trend

TSMC's sales should still outgrow Capex to keep its capital intensity manageable

BofA GLOBAL RESEARCH

Beyond the technology upgrades and capacity expansion, we would note the equipment price hike would drive additional spending required by TSMC in the next few years. Our feedback from the tool suppliers noted they plan to hike the price by 10-15% for the front-end manufacturing equipment and 5-10% for the back-end packaging equipment effective from 2027 to reflect higher component and labor cost.

il With TSMC's stronger bargaining power against the equipment supply chain vs. its peers, it should be able to fully pass on the ~10% higher nominal capex to its customers by lifting its foundry pricing when the tools are delivered for its production ramp in 2H27, setting up a good start for the pricing outlook in 2028.

While the surge in headline capex hike could lead to concern on accelerating depreciation, we estimate it will only grow at 21% CAGR from 2026-28 due to modestly higher portion of the spending towards facility and clean room with much longer depreciation cycle than equipment. This should keep the depreciation still undergrowing its sales of +32% CAGR, sustaining GMs expansion to 68-69% levels by 2028.

Exhibit 15: TSMC Capex spending breakdown by technology TSMC spends the most on advanced front-end but packaging is outgrowing

BofA GLOBAL RESEARCH

We keep our Buy rating on TSMC and lift PO from NT$3,100 to NT$3,260 on unchanged 20x '27E P/E and US$ADR PO from $590 to $620. Our EPS for 2026/27/28E are now NT$112/161/203 (vs. NT$110/156/188 prior) as we factor in stronger CPU and AI GPU/ASIC demand outlook. Its current valuation seems undemanding at 16x '27E P/E (vs. its long term P/E average of 11-21x).

il

Exhibit 16: TSMC's depreciation trend TSMC's depreciation growth will be led by equipment

YoY TSMC's depreciation breakdown (NT$mn)

$1,400,000

$1,200,000

$1,000,000

$800,000

$600,000

$400,000

$200,000

$0

-$200,000

2012

2010

2014

2016

Office depreciation

175%

150%

125%

100%

75%

50%

25%

0%

-25%

2024

2022

2026

2028

Buildings depreciation

Equipment depreciation Equipment depreciation YoY

Buildings depreciation YoY

Office depreciation YoY

Source: Company Data, BofA Global Research estimates BofA GLOBAL RESEARCH

2020

2018

Capacity expansion accelerates across advanced front-end and back-end

As TSMC is in the process to retire a portion of its equipment on 6', 8' and mature 12' processes while still adding the capacity on the advanced nodes, we estimate the company's total front-end manufacturing capacity will drop by 2% YoY in 2026.

Exhibit 17: TSMC's year-end capacity by node for 20nm and below

TSMC will expand aggressively on 3nm and 2nm through 2027

TSMC's year-end capacityby node 20nm and below (k WPM, 12" equivalent)

Exhibit 18: TSMC's advanced node capacity as % of its installed base TSMC's advanced nodes will reach 40% of its total capacity

TSMC's capacity (k WPM, 12" equivalent) TSMC's 7nm and below nodes % of total capacity

900

The trend could be more stable into 2027-28 as TSMC strives to optimize its capacity mix and across node conversion to accommodate its customers' demand especially on the leading-edge technologies, with its advanced capacity set to grow by 10% CAGR from 2025-28 balanced by the mature capacity reduction at -8% CAGR.

Based on our estimate, TSMC's capacity for 7nm and below nodes will grow from 320k WPM per month in 2023 to ~700k WPM by 2028 at a 16% CAGR, through expansion and efficient conversion from higher equipment commonality, cross technology planning and AI productivity gains (e.g. tool idle time and chamber cleaning schedule optimization). This will also support the mix of 7nm and below capacity climb toward 40-45% of its total capacity (vs. 24% in 2023). By region, we expect the capacity expansion through 2027 to enable its overseas fabs to account for 17% of TSMC's total capacity by 2028 (vs. 7% in 2020) and similarly for the advanced node capacity (vs. ~0% in 2023), mainly in Arizona and Kumamoto.

Specifically, we believe the company is on track to its target on 25% CAGR capacity expansion for its 5nm and 3nm from '22-27. We model its 3nm capacity will reach 190k/230k WPM by 4Q26/27. On N2 family, TSMC plans to grow capacity by 70% CAGR from '26-28, with 1 st year ramp delivering 45% more capacity vs. 3nm as it rolls out 5 fabs at once.

BofA GLOBAL RESEARCH

lül

Exhibit 19: TSMC 5nm and below wafer consumption/supply/utilization

Utilization of 5nm and blow to remain high

BofA GLOBAL RESEARCH

On the demand, with 5nm and 3nm generating ~50% of TSMC's revenue in 2025, we analyze the supply and demand landscape through our bottom-up capacity model and wafer consumption by the company's major customers for their major products on these nodes. Based on our estimate, the utilization for 5nm and below nodes could stay high at least 90% if we only consider the effective capacity which is especially important during the period of frequent capacity conversion and new node ramp in the next few years.

Exhibit 21: Major 5nm and below wafer demand at TSMC

Server CPU demand outgrows overall major advanced chipsets Server CPU accounts for 13% in 2028

Exhibit 22: Major 5nm and below wafer demand mix at TSMC

Major 5nm and below waferdemand mix at TSMC

Source: BofA Global Research estimates

Source: BofA Global Research estimates

il

BofA GLOBAL RESEARCH

BofA GLOBAL RESEARCH

Exhibit 20: TSMC 3nm wafer consumption/supply/utilization

TSMC 3nm to see utilization staying close to full

Source: Company Data, BofA Global Research estimates

BofA GLOBAL RESEARCH

We would note 3nm, as a sweet spot for high performance computing, networking and flagship smartphone chipsets, could see the utilization staying close to full even with continued expansion on strong project pipeline, sustaining continued price hike even in 2027 following the price surge in 2025-26. The node could be even more profitable from 2028-29 when the fixed cost starts rolling off following 5 year depreciation cycle.

Exhibit 23: TSMC 3nm wafer consumption by customers

Mediatek/Qualcomm/Nvidia should remain the largest customers following Apple's migration to 2nm

TSMC 3nm wafer consumption (k WPM)

Source: BofA Global Research estimates

BofA GLOBAL RESEARCH

On the back-end packaging, with surging server CPU demand on top of the already strong order backlog for GPUs and ASICs, we estimate the industry's CoWoS supply will need to grow by 52% CAGR from 2026-28. TSMC will still lead the capacity expansion from 120k WPM in 4Q26 to 210k WPM in 4Q27, while the OSATs will also grow their portion of the supply with ASE and Amkor adding capacity to 70-75k+ WPM (vs. 30-35k in 4Q26) and 25-30k WPM (vs. 15-20k by 4Q26) in 4Q27 respectively. Specifically, while TSMC should still lead the supply for complex GPU and ASIC packaging, ASE grows as a major 2 nd source with its capacity share growing from 18% of the industry in '26 to 29% in '28 and proven track record as the major CoWoS full process service provider for AMD's Venice server CPU.

lül

Exhibit 24: Industry CoWoS-R/L supply/demand

CoWoS-R/L utilization should stay at high levels

Industry CoWoS-R/L wafer supply/demand (k WPQ) CoWoS-R/L utilization

Exhibit 25: Industry CoWoS demand

CoWoS demand should remain strong through 2028

BofA GLOBAL RESEARCH

報告_BofA_台積電2330_20261012_022

BofA GLOBAL RESEARCH

We estimate TSMC's SoIC capacity will reach 20k WPM by 4Q26 and will need to grow to 35k WPM by 4Q27 and further to 50k WPM by 4Q28 with the applications proliferating from AMD's GPUs to Apple's M-series CPUs in 2026, hyperscalers' customized ARM based server CPUs in 2027 and adoption by Nvidia for its Feynman GPU along with the inflection of CPO penetration in 2028.

Similar to CoWoS, the SoIC technology could be even more important for TSMC going forward and the capacity ramp could be steep given much faster data transmission required for the HPC chipsets across CPUs, GPUs, AI accelerators and networking switches. At full utilization, we estimate SoIC could contribute US$2.9bn annually to TSMC in 2028 (1% of the company's total sales)

Exhibit 26: TSMC SoIC supply/demand trend

TSMC's SoIC capacity will reach 20k WPM by 4Q26 and will need to grow to 35k WPM by 4Q27

報告_BofA_台積電2330_20261012_023

Source: Company Data, BofA Global Research estimates

il

Solid technology roadmap and execution easing competition concern

TSMC is pursuing a dual track strategy for its front-end manufacturing, advancing the solution for both its consumer and HPC customers. The nodes targeted for consumer chipsets requiring cost efficiency and IP reuse will be introduced on an annual basis to match its customers' yearly product launch schedule. For the HPC applications, the company targets to roll out a new node with biennial cadence, supporting major leaps in performance, transistor density, and power density.

Exhibit 27: Front-end manufacturing roadmap comparison

TSMC's advanced node technology roadmap advancing faster vs. Intel and Samsung and has the widest offerings targeted for different applications

Company End Market / Segment 2023 2024 2025 2026 2027 2028 2029
TSMC Data Center N4P & N4X N3X & N2 N2P & A16 N2X A12
TSMC High-end consumer/mobile N3 N3E N3P & N2 N2P N2U & A14 A13
TSMC Automotive N5A N3A
TSMC Mainstream N4P N4C N3C N2U
Intel Foundry Data center and high-end client 3 3 3 & 18A 18A-P 14A & 14A-E
Intel Foundry Mature 16 16-E Intel/UMC 12
Samsung Foundry Data Center SF4P SF4X SF2X SF2Z
Samsung Foundry High-end consumer/mobile SF4P SF3 SF2 SF2P SF2P+ SF1.4
Samsung Foundry Automotive SF5A SF4A SF2A
Samsung Foundry Mainstream SF4U

Source: BofA Global Research estimates

This is evidenced in its N2 family and below nodes, with N2U ramping in '28 for mobile applications and A13 node in '29 which will be backward compatible to A14. It will also have A12 node in '29 integrated SPR to address power integrity and current delivery constraint suitable for AI/HPC systems. The strategy along with the continued expansion of the derivative offerings for main nodes should position TSMC well to defend its market share with its competitors claiming their progress on the advanced manufacturing.

Specifically, Intel's 18A has been in mass production since 4Q25 for its Panther Lake and Clearwater Forest chipsets though yield will not be fully fine tuned until 1Q27 at 2530k WPM capacity scale in its Oregon and Arizona fabs. The follow on derivative technology, 18A-P, has recently started risk production featuring 9% performance gains though may not enter into mass production until 2027 at the earliest.

Longer term, Intel's next major upgrade will be on 14A which is guided to start risk production in 2028 for commercialization in 2029. It is important to note A14 will be the first major node Intel provides with its external foundry customers and 0.9 PDK is targeted to be shipped in 4Q26.

For Samsung, at its recent SAFE Forum in 2Q26, the company reaffirmed four generations of 2nm roadmap, including SF2 which has been in production since 2025, SF2P in 2026, SF2P+ in 2027-28 and SF2X (no firm date). Notably, the previously announced derivative technologies, including SF2Z featuring backside power for HPC applications and SF2A for automotive applications, were not included in its latest roadmap which should be folded as part of its SF2P+ offerings. With a modest delay for its 2nm progress, the company also pushed out its SF1.4 mass production to 2029 (vs. original 2027).

On the capacity and yield planning for its advanced nodes, Samsung noted its SF2 yield is still at 50-60% levels but confirmed its SF2P+ tooling has been in installation through 2026 for mass production in 2027 in its Taylor fab. Its capacity expansion in the US along with the existing 20k WPM capacity on SF2 in Korea put the company's capacity installed base on the node at 35k WPM by the end of 2027.

BofA GLOBAL RESEARCH

il

Exhibit 28: TSMC's front-end manufacturing transistor density vs. Intel

TSMC is widening its transistor density advantage against Intel as technology advances

Source: BofA Global Research estimates

BofA GLOBAL RESEARCH

Based on the capacity planning and technology roadmap, we believe TSMC retains the leadership through its roadmap and yield execution and scale. Specifically, the company's transistor density has been outperforming by ~30% for its N3/N3E vs. Intel 3/18A. With similar production timing and targeted applications, we estimate the transistor density gap could be even widened to ~50%/~60% for TSMC's upcoming A16/A12 nodes when comparing with Intel 18A-P/14A.

In addition to delivering superior specs on the power, performance and area, TSMC's execution reliability has become self-reinforcing: superior yield and on-time delivery on the leading edge technologies win customer trust. The profitable business opportunity then translates the cash flow funds to the next leg of capex cycle required for further technology and capacity lead. In contrast to TSMC's 150-200k+ WPM capacity scale on every major node at mature yield, Samsung and Intel running their business at 15-20% of the company's scale at 60-70% yield is not sufficient to meet their own demand nor the stringent requirement from the external customers especially as the opportunity cost gets higher on the advanced manufacturing.

On the back-end packaging and testing solutions, TSMC provides its customers with higher complexity of the system level integration across advanced logic dies, CPO components and HBM through its CoWoS and SoIC technologies for the compute density and efficiency optimization. To accommodate larger size package, it is rolling out 5.5-reticle CoWoS in '26 with yield reaching 98%+ and will push the technology to 9.5x/14x reticle limit in '27/'28

Longer term, the company is developing SoW for up to 40-reticle packaging and CoPoS potentially for late '28 / early '29 mass deployment. The company is also upgrading CPO with COUPE solutions from PCB and substrate to interposer for 10x power efficiency uplift and 20x latency reduction though the contribution would still be limited based on our estimate at least through '27 before accelerating to 1% of its sales in '28 with more scale up switch adoption.

While CoPoS mass ramp is toward '29, the CoWoS upgrade at good yield should keep its position vs. Intel's EMIB-T currently at 80-85% pilot yield seeing risk of losing business if it fails to deliver 95%+ mass production yield by mid-'27.

il

SpaceX could be an anchor customer for TSMC, but not co-owning capacity/tech

On top of the competition risk from the incumbent players, the headline of Elon Musk's aggressiveness to build Terafab targeting long term 1 terawatt equivalent chipset capacity for AI compute deployment in the space term also triggers the investor concerns on TSMC's positioning. We believe the risk is overstated as there could be a delay in the qualification process of Intel's 18A for external customers and 14A due to IP and manufacturing flow issues based on the recent supply chain feedback. In addition, the equipment vendors also noted Terafab is only evaluating on equipment spec and potential procurement rather than placing firm orders. With extending equipment delivery lead time, this could put the company in an unfavorable position to receive tools for the initial production ramp in '29 it scheduled.

In the mid-term, Terafab's applications under Texas's JETI program earlier this year outlined ~US$119bn of planned investment across 4 phases from '26-36, with ~60% of it on tool procurement. The spending in '26-28 would be highly skewed toward facility construction before it starts to pull in US$6-8bn equipment per annum from '29-36.

We estimate the company will need to spend US$600mn+ for every 1k WPM expansion on the advanced nodes it targets in the US. Factoring the investment it targets to spend in the next decade, Terafab could only grow its capacity installed base by ~10k WPM per annum at maximum to 96k WPM front-end manufacturing capacity installed by '36, well below TSMC's scale, even if it can successfully deliver the technology roadmap through its own R&D effort and Intel partnership. This would prevent Terafab's operation from the economies of scale as the node migration continues, keeping TSMC as the major foundry partner for Tesla/SpaceX.

Exhibit 29: Wafer supply/demand analysis on Elon Musk's AI deployment target

With Terafab's near term delay and limited long term scale, TSMC will continue to be critical for Musk's ambitious AI compute deployment plan

Wafer supply/demand analysis on Elon Musk's AI deployment target

SpaceX's annual orbital AI deployment target in 2028 (GW) SpaceX's annual orbital AI deployment target in 2029 (GW) Musk's long term target to deploy AI compute annual run rate (GW) 10 100 1,000
TDP of Nvidia's Feynman GPU (W) GPU die output per front-end wafer (units) 6,000 55
Wafer demand for Feynman compute die for SpaceX's in '28 (k WPM) Wafer demand for Feynman compute die for SpaceX's in '29 (k WPM) Wafer demand for Feynman compute die to meet Musk's LT target (k WPM) 10 101 1,006
TSMC's 3nm and below capacity in 2028 (k WPM) 505
Terafab advanced wafer capacity scale by 2028 (k WPM) Terafab capacity by 2036 based on its US$119bn investment plan (k WPM) 0 96

Source: BofA Global Research estimates

We also analyze the wafer consumption from SpaceX's annual orbital AI deployment target in '28/'29 of 10GW/100GW and Musk's long term 1TW target. Assuming the compute it plans to deploy in '28-29 is all powered by the most advanced Nvidia's Feynman GPUs delivering 6kW per package, this would drive 1.7mn/16.7mn chipset demand in '28/'29 respectively which requires 10k/101k monthly advanced wafer production. From the supply perspective, as Feynman GPU will be built on TSMC's A16 node, the chipset demand should be fully accommodated. With limited support from Terafab, SpaceX in this scenario could become one of the largest customers for TSMC consuming ~20% of its advanced node capacity in '29 (vs. ~1% in '26 and ~2% in '28).

Longer term, Musk's ambitious target to deploy 1 terawatt AI compute power annually would consume 1mn+ wafers per month on the advanced nodes. To have higher level of the control on capacity sufficiency, Terafab could consider to partner with TSMC though the likelihood of TSMC licensing technology or operating a fab with Terafab holding a meaningful share should be low. Specifically, we would note TSMC's JV fab record is limited only with WaferTech, SSMC, VIS, JASM, ESMC and AVSM mostly on mature nodes and it did not co-own a fab with Apple who contributed ~21% of its revenue from '15-25 mostly on the advanced processes as it keeps full business control and preserves customer neutrality.

BofA GLOBAL RESEARCH

il

TSMC valuation reasonable and has room to re-rate with its HPC customers

Exhibit 30: TSMC's P/E valuation band

TSMC's share at 16x '27E P/E is undemanding

BofA GLOBAL RESEARCH

Exhibit 31: TSMC's valuation based on BofA estimates

TSMC's valuation of 16x '27E P/E is at the middle of its historical 10-21x range Sep 26

BofA GLOBAL RESEARCH

TSMC's current valuation remains well supported when viewed through both its historical context and its relative positioning vs. its customers. In the past decade, TSMC's forward P/E has averaged ~16x with a range of 10-21x through the cycles.

Exhibit 32: TSMC's P/E trend vs. its customers

TSMC customers' P/E is now at 45% premium to TSMC vs. 22% average

Exhibit 33: TSMC's P/E trend vs. its HPC customers

HPC fabless are the main driver for valuation premium at 100%

Source: BofA Global Research, Bloomberg

BofA GLOBAL RESEARCH

Source: BofA Global Research, Bloomberg

BofA GLOBAL RESEARCH

The relatively more modest valuation improvement for TSMC also contrasts with its customers' more pronounced re-ratings. Based on our analysis of forward P/E spreads, TSMC's major customers usually have a 22% average premium vs. TSMC in the long term though the current level is at 45%, suggesting TSMC's valuation has been lagging.

il Specifically, the valuation deviation for TSMC's HPC customers vs. the company has widened with 100-150% valuation premium vs. TSMC at this stage (vs. historical average of 53%). We believe this is driven by a surge in valuation for the direct beneficiaries from AI data center deployment, including the companies designing GPUs, ASICs and networking chipsets.

Exhibit 34: TSMC's consensus earnings vs. P/E trend TSMC's share price strength only driven by earnings upgrade so far

Source: BofA Global Research, Bloomberg

BofA GLOBAL RESEARCH

It is also noteworthy that, while TSMC's share performance since 2H23 has been solid, it is predominantly driven by the earnings upward revisions rather than multiple expansion. The company's NTM P/E has remained largely stable, only lifted to 18x in the past 2 years vs. its long-term ~17x levels. The company's ADR though has been performing better as it attracts a broader investor base vs. common share, with its premium still at 10% (vs. the long term average 8%) and at 20x 2027 consensus P/E.

With its firmer technology leadership, this should bode well for the company's earnings upgrade cycle and its share should also be re-rated at least 20x NTM P/E (24x P/E for ADR factoring the premium), back closer to its customers and the broader ecosystem.

lül

Exhibit 35: TSM ADR 1-year forward P/E vs. SOX premium

SOX index P/E is at -8% premium vs. TSM ADR

Source: BofA Global Research, Bloomberg

BofA GLOBAL RESEARCH

Exhibit 37: TSMC's quarterly and annual income statement

TSMC's quarterly and annual income statement

(NT$bn, %) 1Q26 2Q26E 3Q26E 4Q26E 1Q27E 2Q27E 3Q27E 4Q27E 2025 2026E 2027E 2028E
Revenues $1,134 $1,270 $1,494 $1,653 $1,703 $1,811 $2,065 $2,212 $3,809 $5,551 $7,790 $9,657
Cost of Sales -$383 -$410 -$494 -$532 -$547 -$584 -$622 -$666 -$1,528 -$1,818 -$2,419 -$3,003
Gross Profit $751 $860 $1,000 $1,121 $1,156 $1,226 $1,443 $1,545 $2,281 $3,733 $5,371 $6,654
Operating Expenses -$92 -$94 -$108 -$115 -$118 -$121 -$131 -$135 -$345 -$410 -$504 -$556
Operating Income $659 $767 $892 $1,006 $1,039 $1,105 $1,312 $1,411 $1,936 $3,324 $4,867 $6,098
Non-operating Income (Exp) $29 $96 $32 $37 $39 $41 $45 $50 $106 $193 $175 $261
Pretax Income $688 $862 $924 $1,043 $1,078 $1,146 $1,358 $1,460 $2,042 $3,517 $5,042 $6,359
Net tax -$115 -$156 -$155 -$175 -$180 -$207 -$228 -$245 -$326 -$601 -$861 -$1,086
Net Income $573 $707 $769 $868 $898 $939 $1,130 $1,215 $1,718 $2,917 $4,185 $5,277
Fully Diluted EPS - Local (NT$) $22.08 $27.25 $29.67 $33.48 $34.65 $36.24 $43.59 $46.88 $66.24 $112.46 $161.36 $203.48
% of Revenue
Gross Profit 66.2 67.7 67.0 67.8 67.9 67.7 69.9 69.9 59.9 67.2 68.9 68.9
Operating Expenses -8.1 -7.4 -7.3 -7.0 -6.9 -6.7 -6.3 -6.1 -9.1 -7.4 -6.5 -5.8
Operating Income 58.1 60.3 59.7 60.9 61.0 61.0 63.6 63.8 50.8 59.9 62.5 63.1
Pretax Income 60.6 67.9 61.8 63.1 63.3 63.3 65.8 66.0 53.6 63.4 64.7 65.9
Net Income 50.5 55.6 51.5 52.5 52.7 51.9 54.7 54.9 45.1 52.5 53.7 54.6
QoQ Growth %
Revenues 8.4 12.0 17.6 10.6 3.1 6.3 14.0 7.1
Gross Profit 15.2 14.5 16.3 12.0 3.1 6.1 17.7 7.1
Operating Income 16.7 16.3 16.4 12.8 3.2 6.4 18.8 7.5
Net Income 13.3 23.4 8.8 12.8 3.5 4.6 20.3 7.6
YoY Growth %
Revenues 35.1 36.0 50.9 58.0 50.2 42.5 38.2 33.8 31.6 45.7 40.3 24.0
Gross Profit 52.3 57.2 70.0 71.9 53.9 42.5 44.3 37.9 40.4 63.6 43.9 23.9
Operating Income 61.9 65.4 78.2 78.1 57.6 44.2 47.1 40.2 46.4 71.7 46.4 25.3
Net Income 58.8 77.8 70.2 71.6 56.7 32.9 46.9 40.0 46.4 69.8 43.5 26.1
EPS 58.3 77.4 70.1 71.7 56.9 33.0 46.9 40.0 46.4 69.8 43.5 26.1

Source: Company data, BofA Global Research

il

Exhibit 36: TSM ADR conversion price vs. common share and premium

TSM ADR premium is higher than common historical level at 10%

BofA GLOBAL RESEARCH

BofA GLOBAL RESEARCH

Exhibit 38: TSMC's quarterly and annual balance sheet

TSMC's quarterly and annual balance sheet

(NT$bn) 1Q26 2Q26E 3Q26E 4Q26E 1Q27E 2Q27E 3Q27E 4Q27E 2025 2026E 2027E 2028E
Cash $3,036 $3,134 $3,761 $4,089 $4,283 $4,625 $5,181 $5,976 $2,768 $4,089 $5,976 $8,950
Short Term Investment $348 $384 $366 $375 $370 $373 $371 $372 $301 $375 $372 $372
Accounts receivable $363 $441 $354 $341 $428 $439 $469 $430 $282 $341 $430 $482
Inventory $311 $386 $366 $357 $422 $445 $474 $457 $288 $357 $457 $552
Other current assets $207 $221 $157 $171 $187 $189 $185 $178 $179 $171 $178 $182
Current Assets $4,266 $4,566 $5,005 $5,332 $5,690 $6,071 $6,680 $7,413 $3,817 $5,332 $7,413 $10,538
Long Term Investments $167 $228 $197 $213 $205 $209 $207 $208 $172 $213 $208 $207
Fixed Assets $3,955 $4,303 $4,587 $5,016 $5,417 $5,824 $6,211 $6,579 $3,692 $5,016 $6,579 $8,038
Other Assets $274 $279 $269 $268 $273 $272 $270 $271 $252 $268 $271 $271
Long-term Assets $4,395 $4,810 $5,053 $5,497 $5,894 $6,305 $6,689 $7,057 $4,116 $5,497 $7,057 $8,517
Total Assets $8,661 $9,376 $10,057 $10,829 $11,584 $12,376 $13,369 $14,470 $7,933 $10,829 $14,470 $19,055
Short term loans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Notes & Accounts Payable $100 $111 $97 $102 $121 $130 $137 $137 $84 $102 $137 $175
Current portion of long term debt $156 $167 $134 $149 $152 $150 $146 $149 $137 $149 $149 $149
Other current Liabilities $1,458 $1,580 $1,580 $1,580 $1,596 $1,596 $1,596 $1,596 $1,237 $1,580 $1,596 $1,611
Current Liabilities $1,714 $1,858 $1,811 $1,831 $1,868 $1,876 $1,879 $1,881 $1,458 $1,831 $1,881 $1,936
Long term debt $901 $864 $902 $895 $893 $889 $895 $893 $896 $895 $893 $893
Other non-current liabilities $113 $179 $134 $177 $151 $160 $155 $209 $118 $177 $209 $237
Long-term Liabilities $1,014 $1,043 $1,036 $1,072 $1,044 $1,049 $1,050 $1,102 $1,014 $1,072 $1,102 $1,129
Total Liabilities $2,729 $2,901 $2,847 $2,903 $2,912 $2,925 $2,929 $2,983 $2,472 $2,903 $2,983 $3,065
Total parent shareholders' equity $5,891 $6,433 $7,170 $7,884 $8,631 $9,410 $10,399 $11,446 $5,420 $7,884 $11,446 $15,949
Minority Interest $41 $42 $40 $41 $41 $41 $41 $41 $41 $41 $41 $41
Total Liabilities and Equity $8,661 $9,376 $10,057 $10,829 $11,584 $12,376 $13,369 $14,470 $7,933 $10,829 $14,470 $19,055

BofA GLOBAL RESEARCH

Source: Company data, BofA Global Research

Exhibit 39: TSMC's quarterly and annual cash flow

TSMC's quarterly and annual cash flow

(NT$bn) 1Q26 2Q26E 3Q26E 4Q26E 1Q27E 2Q27E 3Q27E 4Q27E 2025 2026E 2027E 2028E
Net Profit $572 $707 $769 $868 $898 $940 $1,130 $1,216 $1,718 $2,917 $4,185 $5,277
Depreciation & Amortization $165 $199 $233 $235 $244 $255 $265 $297 $688 $832 $1,061 $1,209
Change in Working Capital -$118 -$155 $156 $15 -$150 -$27 -$48 $63 -$72 -$102 -$162 -$113
Other adjustment $79 $33 $17 $25 $12 $6 $20 $40 -$59 $155 $77 $95
Operating Cash Flow $699 $783 $1,176 $1,143 $1,005 $1,173 $1,368 $1,615 $2,275 $3,801 $5,161 $6,468
Capital Expenditure -$351 -$496 -$497 -$644 -$664 -$664 -$664 -$664 -$1,272 -$1,988 -$2,657 -$2,875
Proceeds from sale of non-current assets $2 $0 $1 $1 $1 $1 $1 $1 $1 $3 $3 $3
Acquisitions/Disposals of investments -$30 -$37 $49 -$24 $12 -$6 $3 -$2 -$37 -$43 $8 $0
Other investment items $22 $40 $10 $0 -$4 $0 $2 $0 $164 $73 -$3 $0
Investing Cash Flow -$357 -$493 -$437 -$667 -$656 -$669 -$659 -$666 -$1,144 -$1,954 -$2,649 -$2,872
Net Share issue/repurchase $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Dividends paid -$130 -$156 -$117 -$156 -$156 -$156 -$156 -$156 -$467 -$558 -$622 -$622
Change in debt $14 -$22 $5 $8 $0 -$5 $2 $1 $43 $5 -$2 -$1
Other financing cash flow -$5 -$7 $0 $0 $0 $0 $0 $0 -$17 -$12 $0 $0
Financing Cash Flow -$120 -$185 -$112 -$148 -$155 -$161 -$154 -$154 -$440 -$565 -$624 -$623
Net Change in Cash $222 $106 $627 $328 $194 $343 $555 $795 $690 $1,282 $1,888 $2,974
Exchange effect $46 -$7 $0 $0 $0 $0 $0 $0 -$50 $38 $0 $0
Cash, Beginning of Year $2,768 $3,036 $3,134 $3,761 $4,089 $4,283 $4,625 $5,181 $2,128 $2,768 $4,089 $5,976
Cash, End of Year $3,036 $3,134 $3,761 $4,089 $4,283 $4,625 $5,181 $5,976 $2,768 $4,089 $5,976 $8,950

Source: Company data, BofA Global Research

BofA GLOBAL RESEARCH

lül

Exhibit 40: Terms and definitions

Glossary of abbreviations/acronyms

Term Definition
AI Artificial Intelligence
AMD Advanced Micro Devices
ASIC Application Specific Integrated Circuit
AVSM Advanced Vision Semiconductor Manufacturing
CoPoS Chip-on-Panel-on-Substrate
CoWoS-L Chip-on-Wafer-on-Substrate-Local Silicon Bridge
CoWoS-R Chip-on-Wafer-on-Substrate-Redistribution Layer
CPO Co-Packaged Optics
CPU Central Processing Unit
EMIB Embedded Multi-die Interconnect Bridge
ESMC European Semiconductor Manufacturing Company
FoCoS Fan-Out Chip on Substrate
GPU Graphic Processing Unit
HBM High Bandwidth Memory
HPC High-Performance Computing
JASM Japan Advanced Semiconductor Manufacturing
JV Joint Venture
SoC System on Chip
SoIC System on Integrated Chips
SoW System-on-Wafer
SPR Super Power Rail
SSMC Systems on Silicon Manufacturing Company
TPU Tensor Processing Unit
VIS Vanguard
WMCM Wafer-level-multi-chip-module
WPM Wafer per month

Source: BofA Global Research

il BofA GLOBAL RESEARCH

Price objective basis & risk

Taiwan Semiconductor Manufacturing Co. (TSMWF / TSM)

Our PO for TSMC is NT$3,260 per share (US$620 per ADR), based on 20x 2027E P/E. TSMC's valuation has traded in the range of 10-26x PE from 2017. 20x is in the mid to high end of the historical range, above the average P/E of 16x. We think a PE above the average is justified given TSMC's enhanced industry position and mid-to-high 50% 5year CAGR in AI should underpin a rerating

Downside risks to our price objective are: (1) greater-than-expected slowdown in global smartphone/consumer electronics demand, (2) Intel's potential insourcing strategy and ambitions in foundry service, (3) execution risks on advanced nodes, and (4) higher than expected tariffs.